ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Meat processed from carcasses
SIC 2+ Digits Required
3+ Characters Required for Products

66

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,091k 184k
MMBtu
$8.16
- Electrical $540k 12,935k
kWh
$0.064
- Natural Gas $331k 51k
MMBtu
$6.10

504

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $104k 8.6k
MMBtu
4.7%
- Electrical $51k 837k
kWh
6.5%
- Natural Gas $20k -
MMBtu
-
Waste $5.4k
Productivity/Other $36k
TOTAL $145k
*May be negative reflecting an increased cost component required to save energy and costs overall

60

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,086k 190k
MMBtu
$7.98
- Electrical $527k 13,435k
kWh
$0.061
- Natural Gas $332k 51k
MMBtu
$6.16

203

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 2.9k
MMBtu
1.5%
- Electrical $16k 284k
kWh
2.1%
- Natural Gas $6.2k -
MMBtu
-
Waste $2.1k
Productivity/Other $17k
TOTAL $49k