ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Animal slaughtering and processing
SIC 2+ Digits Required
3+ Characters Required for Products

162

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,717k 286k
MMBtu
$7.63
- Electrical $771k 16,707k
kWh
$0.059
- Natural Gas $605k 111k
MMBtu
$6.38

1,355

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $161k 12k
MMBtu
4.2%
- Electrical $69k 1,160k
kWh
6.9%
- Natural Gas $53k -
MMBtu
-
Waste $5.4k
Productivity/Other $42k
TOTAL $208k
*May be negative reflecting an increased cost component required to save energy and costs overall

160

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,733k 288k
MMBtu
$7.64
- Electrical $778k 16,879k
kWh
$0.059
- Natural Gas $610k 112k
MMBtu
$6.40

553

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $46k 3.5k
MMBtu
1.2%
- Electrical $19k 344k
kWh
2.0%
- Natural Gas $16k -
MMBtu
-
Waste $1.3k
Productivity/Other $14k
TOTAL $61k
*May be negative reflecting an increased cost component required to save energy and costs overall