ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Animal slaughtering and processing
SIC 2+ Digits Required
3+ Characters Required for Products

178

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,655k 271k
MMBtu
$7.92
- Electrical $756k 15,841k
kWh
$0.063
- Natural Gas $579k 105k
MMBtu
$6.43

1,453

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $154k 11k
MMBtu
4.2%
- Electrical $70k 1,111k
kWh
7.0%
- Natural Gas $49k -
MMBtu
-
Waste $5.9k
Productivity/Other $41k
TOTAL $201k
*May be negative reflecting an increased cost component required to save energy and costs overall

169

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,697k 280k
MMBtu
$7.75
- Electrical $769k 16,365k
kWh
$0.061
- Natural Gas $596k 108k
MMBtu
$6.52

580

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 3.5k
MMBtu
1.2%
- Electrical $20k 341k
kWh
2.1%
- Natural Gas $15k -
MMBtu
-
Waste $2.2k
Productivity/Other $13k
TOTAL $60k
*May be negative reflecting an increased cost component required to save energy and costs overall