The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 311520 Ice cream and frozen dessert manufacturing

28

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $949k 208k
MMBtu
$7.05
- Electrical $512k 17,584k
kWh
$0.050
- Natural Gas $142k 27k
MMBtu
$5.19

215

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 4.9k
MMBtu
2.4%
- Electrical $24k 479k
kWh
2.7%
- Natural Gas $13k -
MMBtu
-
Waste $4.9k
Productivity/Other $52k
TOTAL $104k
*May be negative reflecting an increased cost component required to save energy and costs overall

27

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $979k 215k
MMBtu
$6.38
- Electrical $527k 18,216k
kWh
$0.046
- Natural Gas $147k 28k
MMBtu
$5.01

92

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $16k 1.5k
MMBtu
0.7%
- Electrical $7.1k 146k
kWh
0.8%
- Natural Gas $5.1k -
MMBtu
-
Waste $1.1k
Productivity/Other $9.4k
TOTAL $27k
*May be negative reflecting an increased cost component required to save energy and costs overall