ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Dry, condensed, and evaporated dairy product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

29

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,523k 300k
MMBtu
$7.77
- Electrical $623k 11,497k
kWh
$0.068
- Natural Gas $583k 102k
MMBtu
$6.98

259

Recommendations

8.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $156k 13k
MMBtu
4.4%
- Electrical $77k 1,298k
kWh
11.3%
- Natural Gas $39k -
MMBtu
-
Waste $15k
Productivity/Other $43k
TOTAL $214k
*May be negative reflecting an increased cost component required to save energy and costs overall

28

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,524k 304k
MMBtu
$7.77
- Electrical $622k 11,591k
kWh
$0.067
- Natural Gas $582k 101k
MMBtu
$7.02

139

Implemented Recommendations

5.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $54k 3.6k
MMBtu
1.2%
- Electrical $20k 353k
kWh
3.0%
- Natural Gas $20k -
MMBtu
-
Waste $5.3k
Productivity/Other $42k
TOTAL $101k
*May be negative reflecting an increased cost component required to save energy and costs overall