ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Cheese manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

46

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,597k 267k
MMBtu
$7.27
- Electrical $680k 14,718k
kWh
$0.055
- Natural Gas $487k 104k
MMBtu
$5.30

363

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $129k 17k
MMBtu
6.4%
- Electrical $86k 1,680k
kWh
11.4%
- Natural Gas $12k -
MMBtu
-
Waste $4.9k
Productivity/Other $33k
TOTAL $167k
*May be negative reflecting an increased cost component required to save energy and costs overall

44

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,541k 262k
MMBtu
$7.20
- Electrical $645k 14,059k
kWh
$0.055
- Natural Gas $508k 108k
MMBtu
$5.40

136

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $38k 2.5k
MMBtu
0.9%
- Electrical $16k 240k
kWh
1.7%
- Natural Gas $18k -
MMBtu
-
Waste $0.0k
Productivity/Other $11k
TOTAL $50k