Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Cheese manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

46

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,606k 267k
MMBtu
$7.33
- Electrical $692k 14,718k
kWh
$0.057
- Natural Gas $487k 104k
MMBtu
$5.30

363

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $129k 17k
MMBtu
6.4%
- Electrical $86k 1,680k
kWh
11.4%
- Natural Gas $12k -
MMBtu
-
Waste $4.9k
Productivity/Other $33k
TOTAL $167k
*May be negative reflecting an increased cost component required to save energy and costs overall

40

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,450k 259k
MMBtu
$7.06
- Electrical $630k 13,993k
kWh
$0.055
- Natural Gas $497k 110k
MMBtu
$5.28

133

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $35k 2.7k
MMBtu
1.0%
- Electrical $17k 259k
kWh
1.8%
- Natural Gas $13k -
MMBtu
-
Waste $0.0k
Productivity/Other $13k
TOTAL $48k
*May be negative reflecting an increased cost component required to save energy and costs overall