ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Creamery butter manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,181k 159k
MMBtu
$9.06
- Electrical $740k 8,463k
kWh
$0.086
- Natural Gas $171k 62k
MMBtu
$3.81

37

Recommendations

9.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $183k 21k
MMBtu
13.0%
- Electrical $288k 2,014k
kWh
23.8%
- Natural Gas $7.7k -
MMBtu
-
Waste -
Productivity/Other $32k
TOTAL $215k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,181k 159k
MMBtu
$9.06
- Electrical $740k 8,463k
kWh
$0.086
- Natural Gas $171k 62k
MMBtu
$3.81

17

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $42k 5.4k
MMBtu
3.4%
- Electrical $33k 528k
kWh
6.2%
- Natural Gas $7.2k -
MMBtu
-
Waste -
Productivity/Other $32k
TOTAL $74k
*May be negative reflecting an increased cost component required to save energy and costs overall