ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Fluid milk manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

74

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,313k 174k
MMBtu
$8.37
- Electrical $640k 10,819k
kWh
$0.065
- Natural Gas $359k 59k
MMBtu
$6.25

578

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $163k 18k
MMBtu
10.5%
- Electrical $103k 1,786k
kWh
16.5%
- Natural Gas $59k -
MMBtu
-
Waste $16k
Productivity/Other $96k
TOTAL $275k
*May be negative reflecting an increased cost component required to save energy and costs overall

71

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,299k 176k
MMBtu
$8.06
- Electrical $642k 11,000k
kWh
$0.063
- Natural Gas $348k 58k
MMBtu
$6.14

257

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $67k 6.7k
MMBtu
3.8%
- Electrical $42k 658k
kWh
6.0%
- Natural Gas $13k -
MMBtu
-
Waste $6.0k
Productivity/Other $79k
TOTAL $152k
*May be negative reflecting an increased cost component required to save energy and costs overall