ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Dairy product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

183

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,370k 224k
MMBtu
$7.80
- Electrical $634k 12,951k
kWh
$0.061
- Natural Gas $394k 73k
MMBtu
$5.91

1,470

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $136k 15k
MMBtu
6.8%
- Electrical $86k 1,477k
kWh
11.4%
- Natural Gas $37k -
MMBtu
-
Waste $11k
Productivity/Other $63k
TOTAL $210k
*May be negative reflecting an increased cost component required to save energy and costs overall

177

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,354k 224k
MMBtu
$7.67
- Electrical $630k 13,044k
kWh
$0.060
- Natural Gas $385k 72k
MMBtu
$5.86

643

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $49k 4.2k
MMBtu
1.9%
- Electrical $26k 413k
kWh
3.2%
- Natural Gas $14k -
MMBtu
-
Waste $3.4k
Productivity/Other $43k
TOTAL $95k
*May be negative reflecting an increased cost component required to save energy and costs overall