ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Dried and dehydrated food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

19

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,239k 319k
MMBtu
$8.80
- Electrical $857k 14,244k
kWh
$0.071
- Natural Gas $939k 160k
MMBtu
$5.63

157

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $315k 19k
MMBtu
5.8%
- Electrical $151k 1,807k
kWh
12.7%
- Natural Gas $31k -
MMBtu
-
Waste $0.2k
Productivity/Other $59k
TOTAL $375k
*May be negative reflecting an increased cost component required to save energy and costs overall

15

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,063k 299k
MMBtu
$8.50
- Electrical $801k 13,812k
kWh
$0.069
- Natural Gas $867k 147k
MMBtu
$4.70

63

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $119k 4.9k
MMBtu
1.7%
- Electrical $48k 481k
kWh
3.5%
- Natural Gas $35k -
MMBtu
-
Waste -
Productivity/Other $16k
TOTAL $135k
*May be negative reflecting an increased cost component required to save energy and costs overall