ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Fruit and vegetable canning
SIC 2+ Digits Required
3+ Characters Required for Products

67

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,526k 340k
MMBtu
$7.17
- Electrical $489k 7,546k
kWh
$0.068
- Natural Gas $681k 165k
MMBtu
$5.46

624

Recommendations

9.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $159k 7.7k
MMBtu
2.3%
- Electrical $58k 750k
kWh
9.9%
- Natural Gas $68k -
MMBtu
-
Waste $12k
Productivity/Other $72k
TOTAL $243k
*May be negative reflecting an increased cost component required to save energy and costs overall

65

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,527k 342k
MMBtu
$7.17
- Electrical $491k 7,584k
kWh
$0.068
- Natural Gas $683k 164k
MMBtu
$5.51

278

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $72k 3.1k
MMBtu
0.9%
- Electrical $24k 301k
kWh
4.0%
- Natural Gas $27k -
MMBtu
-
Waste $10k
Productivity/Other $59k
TOTAL $141k
*May be negative reflecting an increased cost component required to save energy and costs overall