ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Frozen food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

89

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,522k 235k
MMBtu
$53.87
- Electrical $766k 13,896k
kWh
$0.38
- Natural Gas $425k 88k
MMBtu
$5.15

684

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $211k 20k
MMBtu
8.4%
- Electrical $139k 1,922k
kWh
13.8%
- Natural Gas $30k -
MMBtu
-
Waste $6.5k
Productivity/Other $109k
TOTAL $327k
*May be negative reflecting an increased cost component required to save energy and costs overall

80

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,446k 227k
MMBtu
$59.01
- Electrical $723k 13,306k
kWh
$0.41
- Natural Gas $435k 88k
MMBtu
$5.15

274

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 4.9k
MMBtu
2.2%
- Electrical $31k 479k
kWh
3.6%
- Natural Gas $8.5k -
MMBtu
-
Waste $0.3k
Productivity/Other $66k
TOTAL $112k