ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Frozen food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

89

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,522k 235k
MMBtu
$53.87
- Electrical $766k 13,896k
kWh
$0.38
- Natural Gas $425k 88k
MMBtu
$5.15

684

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $157k 20k
MMBtu
8.4%
- Electrical $139k 1,922k
kWh
13.8%
- Natural Gas ($-24.6)k -
MMBtu
-
Waste $6.5k
Productivity/Other $163k
TOTAL $327k
*May be negative reflecting an increased cost component required to save energy and costs overall

83

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,420k 222k
MMBtu
$57.23
- Electrical $708k 13,045k
kWh
$0.40
- Natural Gas $423k 86k
MMBtu
$5.26

280

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 5.0k
MMBtu
2.2%
- Electrical $31k 485k
kWh
3.7%
- Natural Gas $8.2k -
MMBtu
-
Waste $0.3k
Productivity/Other $64k
TOTAL $109k
*May be negative reflecting an increased cost component required to save energy and costs overall