ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Chocolate and confectionery manufacturing from cacao beans
SIC 2+ Digits Required
3+ Characters Required for Products

13

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,416k 154k
MMBtu
$9.83
- Electrical $668k 9,967k
kWh
$0.076
- Natural Gas $497k 51k
MMBtu
$7.61

111

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $116k 9.6k
MMBtu
6.2%
- Electrical $87k 936k
kWh
9.4%
- Natural Gas $16k -
MMBtu
-
Waste $4.9k
Productivity/Other $12k
TOTAL $132k
*May be negative reflecting an increased cost component required to save energy and costs overall

11

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,545k 157k
MMBtu
$10.40
- Electrical $704k 9,996k
kWh
$0.082
- Natural Gas $558k 55k
MMBtu
$8.09

42

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 2.7k
MMBtu
1.7%
- Electrical $22k 260k
kWh
2.6%
- Natural Gas $7.2k -
MMBtu
-
Waste $3.9k
Productivity/Other $0.0k
TOTAL $37k