The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 31135 Chocolate and confectionery manufacturing

30

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,012k 118k
MMBtu
$10.59
- Electrical $512k 8,030k
kWh
$0.084
- Natural Gas $323k 36k
MMBtu
$7.63

254

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $95k 8.6k
MMBtu
7.3%
- Electrical $69k 839k
kWh
10.4%
- Natural Gas $16k -
MMBtu
-
Waste $2.5k
Productivity/Other $13k
TOTAL $111k
*May be negative reflecting an increased cost component required to save energy and costs overall

27

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,007k 116k
MMBtu
$10.85
- Electrical $503k 7,799k
kWh
$0.088
- Natural Gas $326k 36k
MMBtu
$7.63

105

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 2.9k
MMBtu
2.5%
- Electrical $20k 282k
kWh
3.6%
- Natural Gas $5.2k -
MMBtu
-
Waste $1.6k
Productivity/Other $5.8k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall