The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 31134 Nonchocolate confectionery manufacturing

10

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,243k 182k
MMBtu
$7.41
- Electrical $469k 8,872k
kWh
$0.058
- Natural Gas $504k 90k
MMBtu
$6.05

78

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $111k 6.4k
MMBtu
3.5%
- Electrical $37k 626k
kWh
7.1%
- Natural Gas $62k -
MMBtu
-
Waste $65k
Productivity/Other $110k
TOTAL $285k
*May be negative reflecting an increased cost component required to save energy and costs overall

10

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,243k 182k
MMBtu
$7.41
- Electrical $469k 8,872k
kWh
$0.058
- Natural Gas $504k 90k
MMBtu
$6.05

28

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $37k 3.3k
MMBtu
1.8%
- Electrical $18k 320k
kWh
3.6%
- Natural Gas $14k -
MMBtu
-
Waste $65k
Productivity/Other $17k
TOTAL $119k
*May be negative reflecting an increased cost component required to save energy and costs overall