ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Cane sugar manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

11

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,974k 805k
MMBtu
$7.23
- Electrical $652k 7,591k
kWh
$0.083
- Natural Gas $1,993k 507k
MMBtu
$2.72

84

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $229k 23k
MMBtu
2.9%
- Electrical $186k 2,271k
kWh
29.9%
- Natural Gas $41k -
MMBtu
-
Waste $1.4k
Productivity/Other $75k
TOTAL $305k
*May be negative reflecting an increased cost component required to save energy and costs overall

11

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,974k 805k
MMBtu
$7.23
- Electrical $652k 7,591k
kWh
$0.083
- Natural Gas $1,993k 507k
MMBtu
$2.72

35

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $89k 9.6k
MMBtu
1.2%
- Electrical $82k 941k
kWh
12.4%
- Natural Gas $11k -
MMBtu
-
Waste -
Productivity/Other $0.6k
TOTAL $90k
*May be negative reflecting an increased cost component required to save energy and costs overall