ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Sugar manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

12

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,009k 798k
MMBtu
$7.03
- Electrical $615k 7,396k
kWh
$0.079
- Natural Gas $2,078k 520k
MMBtu
$2.87

88

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $234k 22k
MMBtu
2.7%
- Electrical $172k 2,117k
kWh
28.6%
- Natural Gas $60k -
MMBtu
-
Waste $1.3k
Productivity/Other $68k
TOTAL $304k
*May be negative reflecting an increased cost component required to save energy and costs overall

12

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,009k 798k
MMBtu
$7.03
- Electrical $615k 7,396k
kWh
$0.079
- Natural Gas $2,078k 520k
MMBtu
$2.87

36

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $82k 8.9k
MMBtu
1.1%
- Electrical $76k 866k
kWh
11.7%
- Natural Gas $10k -
MMBtu
-
Waste -
Productivity/Other $0.6k
TOTAL $83k
*May be negative reflecting an increased cost component required to save energy and costs overall