ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Sugar manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

10

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,310k 616k
MMBtu
$7.60
- Electrical $504k 6,021k
kWh
$0.082
- Natural Gas $1,444k 312k
MMBtu
$2.69

78

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $243k 25k
MMBtu
4.0%
- Electrical $196k 2,408k
kWh
40.0%
- Natural Gas $45k -
MMBtu
-
Waste $1.5k
Productivity/Other $82k
TOTAL $327k
*May be negative reflecting an increased cost component required to save energy and costs overall

10

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,310k 616k
MMBtu
$7.60
- Electrical $504k 6,021k
kWh
$0.082
- Natural Gas $1,444k 312k
MMBtu
$2.69

32

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $96k 10k
MMBtu
1.7%
- Electrical $89k 1,016k
kWh
16.9%
- Natural Gas $12k -
MMBtu
-
Waste -
Productivity/Other $0.7k
TOTAL $97k
*May be negative reflecting an increased cost component required to save energy and costs overall