ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Soybean and other oilseed processing
SIC 2+ Digits Required
3+ Characters Required for Products

11

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,702k 243k
MMBtu
$11.82
- Electrical $666k 10,204k
kWh
$0.11
- Natural Gas $899k 139k
MMBtu
$9.08

78

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $194k 5.9k
MMBtu
2.4%
- Electrical $51k 573k
kWh
5.6%
- Natural Gas $133k -
MMBtu
-
Waste -
Productivity/Other $3.8k
TOTAL $197k
*May be negative reflecting an increased cost component required to save energy and costs overall

11

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,702k 243k
MMBtu
$11.82
- Electrical $666k 10,204k
kWh
$0.11
- Natural Gas $899k 139k
MMBtu
$9.08

46

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $103k 2.5k
MMBtu
1.0%
- Electrical $22k 240k
kWh
2.4%
- Natural Gas $77k -
MMBtu
-
Waste -
Productivity/Other $3.6k
TOTAL $106k
*May be negative reflecting an increased cost component required to save energy and costs overall