ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Wet corn milling
SIC 2+ Digits Required
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $632k 92k
MMBtu
$6.92
- Electrical $344k 5,627k
kWh
$0.059
- Natural Gas $171k 34k
MMBtu
$5.81

18

Recommendations

9.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $112k 2.1k
MMBtu
2.3%
- Electrical $12k 208k
kWh
3.7%
- Natural Gas $98k -
MMBtu
-
Waste -
Productivity/Other $5.5k
TOTAL $118k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $632k 92k
MMBtu
$6.92
- Electrical $344k 5,627k
kWh
$0.059
- Natural Gas $171k 34k
MMBtu
$5.81

13

Implemented Recommendations

6.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 1.6k
MMBtu
1.8%
- Electrical $9.7k 161k
kWh
2.9%
- Natural Gas $21k -
MMBtu
-
Waste -
Productivity/Other $30k
TOTAL $63k
*May be negative reflecting an increased cost component required to save energy and costs overall