ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Rice milling
SIC 2+ Digits Required
3+ Characters Required for Products

18

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $697k 146k
MMBtu
$8.62
- Electrical $359k 10,101k
kWh
$0.070
- Natural Gas $147k 43k
MMBtu
$5.05

146

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $67k 11k
MMBtu
7.7%
- Electrical $39k 1,105k
kWh
10.9%
- Natural Gas $16k -
MMBtu
-
Waste $0.1k
Productivity/Other $57k
TOTAL $124k
*May be negative reflecting an increased cost component required to save energy and costs overall

17

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $693k 150k
MMBtu
$8.57
- Electrical $343k 10,262k
kWh
$0.069
- Natural Gas $156k 45k
MMBtu
$5.35

64

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 6.5k
MMBtu
4.3%
- Electrical $19k 633k
kWh
6.2%
- Natural Gas $8.8k -
MMBtu
-
Waste $0.1k
Productivity/Other $22k
TOTAL $54k
*May be negative reflecting an increased cost component required to save energy and costs overall