ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Flour milling
SIC 2+ Digits Required
3+ Characters Required for Products

17

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,740k 319k
MMBtu
$8.40
- Electrical $905k 20,089k
kWh
$0.067
- Natural Gas $427k 113k
MMBtu
$6.36

130

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $90k 12k
MMBtu
3.7%
- Electrical $55k 1,164k
kWh
5.8%
- Natural Gas $10k -
MMBtu
-
Waste $1.7k
Productivity/Other $20k
TOTAL $111k
*May be negative reflecting an increased cost component required to save energy and costs overall

15

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,852k 346k
MMBtu
$8.37
- Electrical $919k 21,215k
kWh
$0.066
- Natural Gas $480k 128k
MMBtu
$5.02

57

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 3.8k
MMBtu
1.1%
- Electrical $20k 370k
kWh
1.7%
- Natural Gas $1.2k -
MMBtu
-
Waste -
Productivity/Other $15k
TOTAL $44k
*May be negative reflecting an increased cost component required to save energy and costs overall