ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Grain and oilseed milling
SIC 2+ Digits Required
3+ Characters Required for Products

82

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,452k 262k
MMBtu
$8.39
- Electrical $626k 13,540k
kWh
$0.068
- Natural Gas $578k 123k
MMBtu
$6.16

658

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $129k 14k
MMBtu
5.2%
- Electrical $65k 1,324k
kWh
9.8%
- Natural Gas $47k -
MMBtu
-
Waste $14k
Productivity/Other $45k
TOTAL $188k
*May be negative reflecting an increased cost component required to save energy and costs overall

77

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,502k 275k
MMBtu
$8.06
- Electrical $631k 14,025k
kWh
$0.065
- Natural Gas $614k 130k
MMBtu
$6.00

301

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $57k 5.0k
MMBtu
1.8%
- Electrical $24k 491k
kWh
3.5%
- Natural Gas $29k -
MMBtu
-
Waste $0.6k
Productivity/Other $43k
TOTAL $100k
*May be negative reflecting an increased cost component required to save energy and costs overall