ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other animal food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

53

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $722k 103k
MMBtu
$8.16
- Electrical $285k 4,986k
kWh
$0.067
- Natural Gas $320k 52k
MMBtu
$6.01

395

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $51k 3.0k
MMBtu
2.9%
- Electrical $19k 293k
kWh
5.9%
- Natural Gas $19k -
MMBtu
-
Waste $0.4k
Productivity/Other $13k
TOTAL $64k
*May be negative reflecting an increased cost component required to save energy and costs overall

52

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $734k 105k
MMBtu
$8.23
- Electrical $291k 5,076k
kWh
$0.067
- Natural Gas $325k 52k
MMBtu
$6.06

178

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 1.0k
MMBtu
1.0%
- Electrical $6.4k 99k
kWh
2.0%
- Natural Gas $8.4k -
MMBtu
-
Waste $0.1k
Productivity/Other $2.4k
TOTAL $19k
*May be negative reflecting an increased cost component required to save energy and costs overall