Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other animal food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

56

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $764k 108k
MMBtu
$8.19
- Electrical $302k 5,129k
kWh
$0.068
- Natural Gas $341k 55k
MMBtu
$5.97

417

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $71k 3.2k
MMBtu
3.0%
- Electrical $21k 311k
kWh
6.1%
- Natural Gas $37k -
MMBtu
-
Waste $0.4k
Productivity/Other $62k
TOTAL $133k
*May be negative reflecting an increased cost component required to save energy and costs overall

55

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $768k 109k
MMBtu
$8.19
- Electrical $301k 5,151k
kWh
$0.068
- Natural Gas $345k 56k
MMBtu
$6.00

192

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 1.0k
MMBtu
0.9%
- Electrical $6.2k 96k
kWh
1.9%
- Natural Gas $24k -
MMBtu
-
Waste $0.1k
Productivity/Other $14k
TOTAL $46k
*May be negative reflecting an increased cost component required to save energy and costs overall