ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Dog and cat food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

17

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,089k 177k
MMBtu
$7.32
- Electrical $442k 8,275k
kWh
$0.058
- Natural Gas $438k 90k
MMBtu
$5.41

142

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $189k 15k
MMBtu
8.6%
- Electrical $86k 1,489k
kWh
18.0%
- Natural Gas $23k -
MMBtu
-
Waste $4.4k
Productivity/Other $61k
TOTAL $255k
*May be negative reflecting an increased cost component required to save energy and costs overall

16

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,074k 173k
MMBtu
$7.44
- Electrical $432k 8,006k
kWh
$0.058
- Natural Gas $434k 88k
MMBtu
$5.47

68

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $84k 4.5k
MMBtu
2.6%
- Electrical $36k 434k
kWh
5.4%
- Natural Gas $3.1k -
MMBtu
-
Waste -
Productivity/Other $16k
TOTAL $99k
*May be negative reflecting an increased cost component required to save energy and costs overall