The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 31111 Animal food manufacturing

70

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $812k 121k
MMBtu
$7.96
- Electrical $323k 5,785k
kWh
$0.065
- Natural Gas $348k 61k
MMBtu
$5.86

537

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $85k 6.0k
MMBtu
4.9%
- Electrical $36k 583k
kWh
10.1%
- Natural Gas $20k -
MMBtu
-
Waste $1.4k
Productivity/Other $25k
TOTAL $111k
*May be negative reflecting an increased cost component required to save energy and costs overall

68

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $814k 121k
MMBtu
$8.05
- Electrical $324k 5,765k
kWh
$0.065
- Natural Gas $350k 61k
MMBtu
$5.92

246

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 1.8k
MMBtu
1.5%
- Electrical $13k 178k
kWh
3.1%
- Natural Gas $7.1k -
MMBtu
-
Waste $0.1k
Productivity/Other $5.6k
TOTAL $38k
*May be negative reflecting an increased cost component required to save energy and costs overall