ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Animal food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

74

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $856k 126k
MMBtu
$8.00
- Electrical $336k 6,038k
kWh
$0.065
- Natural Gas $363k 63k
MMBtu
$5.85

566

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $98k 6.0k
MMBtu
4.7%
- Electrical $36k 581k
kWh
9.6%
- Natural Gas $33k -
MMBtu
-
Waste $2.5k
Productivity/Other $61k
TOTAL $161k
*May be negative reflecting an increased cost component required to save energy and costs overall

72

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $844k 125k
MMBtu
$7.99
- Electrical $335k 5,889k
kWh
$0.065
- Natural Gas $367k 64k
MMBtu
$5.86

263

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 1.8k
MMBtu
1.4%
- Electrical $13k 171k
kWh
2.9%
- Natural Gas $19k -
MMBtu
-
Waste $0.1k
Productivity/Other $19k
TOTAL $64k
*May be negative reflecting an increased cost component required to save energy and costs overall