ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

1,303

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,267k 201k
MMBtu
$11.62
- Electrical $580k 10,452k
kWh
$0.091
- Natural Gas $437k 82k
MMBtu
$6.05

10,284

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $133k 12k
MMBtu
5.8%
- Electrical $77k 1,144k
kWh
10.9%
- Natural Gas $30k -
MMBtu
-
Waste $8.8k
Productivity/Other $57k
TOTAL $199k
*May be negative reflecting an increased cost component required to save energy and costs overall

1,237

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,284k 205k
MMBtu
$11.64
- Electrical $583k 10,625k
kWh
$0.091
- Natural Gas $450k 85k
MMBtu
$6.04

4,427

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $49k 4.1k
MMBtu
2.0%
- Electrical $27k 400k
kWh
3.8%
- Natural Gas $13k -
MMBtu
-
Waste $3.7k
Productivity/Other $29k
TOTAL $82k
*May be negative reflecting an increased cost component required to save energy and costs overall