ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

1,089

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,250k 206k
MMBtu
$11.68
- Electrical $564k 10,626k
kWh
$0.090
- Natural Gas $447k 85k
MMBtu
$5.93

8,846

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $121k 11k
MMBtu
5.1%
- Electrical $65k 1,027k
kWh
9.7%
- Natural Gas $35k -
MMBtu
-
Waste $7.8k
Productivity/Other $54k
TOTAL $183k
*May be negative reflecting an increased cost component required to save energy and costs overall

1,076

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,257k 207k
MMBtu
$11.74
- Electrical $567k 10,681k
kWh
$0.091
- Natural Gas $450k 85k
MMBtu
$5.93

3,964

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 3.9k
MMBtu
1.9%
- Electrical $24k 382k
kWh
3.6%
- Natural Gas $13k -
MMBtu
-
Waste $2.7k
Productivity/Other $29k
TOTAL $78k
*May be negative reflecting an increased cost component required to save energy and costs overall