ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

1,295

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,268k 201k
MMBtu
$11.60
- Electrical $579k 10,452k
kWh
$0.091
- Natural Gas $439k 83k
MMBtu
$6.04

10,234

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $134k 12k
MMBtu
5.8%
- Electrical $77k 1,146k
kWh
11.0%
- Natural Gas $30k -
MMBtu
-
Waste $8.9k
Productivity/Other $57k
TOTAL $199k
*May be negative reflecting an increased cost component required to save energy and costs overall

1,226

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,283k 206k
MMBtu
$11.64
- Electrical $582k 10,623k
kWh
$0.091
- Natural Gas $452k 85k
MMBtu
$6.06

4,379

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $49k 4.1k
MMBtu
2.0%
- Electrical $26k 398k
kWh
3.7%
- Natural Gas $13k -
MMBtu
-
Waste $3.6k
Productivity/Other $29k
TOTAL $82k
*May be negative reflecting an increased cost component required to save energy and costs overall