ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

1,236

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,276k 205k
MMBtu
$11.62
- Electrical $580k 10,586k
kWh
$0.091
- Natural Gas $449k 85k
MMBtu
$6.07

9,795

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $130k 12k
MMBtu
5.7%
- Electrical $76k 1,143k
kWh
10.8%
- Natural Gas $30k -
MMBtu
-
Waste $8.8k
Productivity/Other $56k
TOTAL $195k
*May be negative reflecting an increased cost component required to save energy and costs overall

1,164

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,275k 207k
MMBtu
$11.62
- Electrical $575k 10,654k
kWh
$0.090
- Natural Gas $457k 86k
MMBtu
$6.02

4,225

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 4.0k
MMBtu
1.9%
- Electrical $26k 393k
kWh
3.7%
- Natural Gas $13k -
MMBtu
-
Waste $3.2k
Productivity/Other $28k
TOTAL $78k
*May be negative reflecting an increased cost component required to save energy and costs overall