ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Food manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

1,222

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,283k 206k
MMBtu
$11.63
- Electrical $582k 10,656k
kWh
$0.090
- Natural Gas $453k 85k
MMBtu
$6.08

9,703

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $135k 12k
MMBtu
5.7%
- Electrical $76k 1,150k
kWh
10.8%
- Natural Gas $34k -
MMBtu
-
Waste $8.9k
Productivity/Other $52k
TOTAL $196k
*May be negative reflecting an increased cost component required to save energy and costs overall

1,136

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,275k 209k
MMBtu
$11.66
- Electrical $575k 10,715k
kWh
$0.090
- Natural Gas $459k 87k
MMBtu
$6.02

4,144

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $46k 4.0k
MMBtu
1.9%
- Electrical $25k 389k
kWh
3.6%
- Natural Gas $13k -
MMBtu
-
Waste $3.2k
Productivity/Other $28k
TOTAL $78k
*May be negative reflecting an increased cost component required to save energy and costs overall