ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Siding contractors
SIC 2+ Digits Required
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $8,194k 1,198k
MMBtu
$6.84
- Electrical $2,416k 49,591k
kWh
$0.049
- Natural Gas $980k 127k
MMBtu
$7.71

9

Recommendations

9.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $581k 20k
MMBtu
1.7%
- Electrical $84k 1,930k
kWh
3.9%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $581k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $8,194k 1,198k
MMBtu
$6.84
- Electrical $2,416k 49,591k
kWh
$0.049
- Natural Gas $980k 127k
MMBtu
$7.71

4

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $458k 4.6k
MMBtu
0.4%
- Electrical $22k 453k
kWh
0.9%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $458k
*May be negative reflecting an increased cost component required to save energy and costs overall