The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC | 2+ Digits Required | |
NAICS | Structural steel and precast concrete contractors | |
SIC | 2+ Digits Required | |
3+ Characters Required for Products |
3
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $310k | 39k |
MMBtu
|
$7.46 |
- Electrical | $124k | 2,783k |
kWh
|
$0.045 |
- Natural Gas | $133k | 10k |
MMBtu
|
$10.95 |
25
Recommendations
8.3
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $41k | 3.1k |
MMBtu
|
8.0% |
- Electrical | $14k | 303k |
kWh
|
10.9% |
- Natural Gas | $13k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | ($-0.1)k | |||
TOTAL | $41k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
3
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $310k | 39k |
MMBtu
|
$7.46 |
- Electrical | $124k | 2,783k |
kWh
|
$0.045 |
- Natural Gas | $133k | 10k |
MMBtu
|
$10.95 |
11
Implemented Recommendations
3.7
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $9.4k | 1.0k |
MMBtu
|
2.6% |
- Electrical | $4.3k | 99k |
kWh
|
3.5% |
- Natural Gas | $3.9k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | ($-0.1)k | |||
TOTAL | $9.3k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |