ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Structural steel and precast concrete contractors
SIC 2+ Digits Required
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $310k 39k
MMBtu
$7.46
- Electrical $124k 2,783k
kWh
$0.045
- Natural Gas $133k 10k
MMBtu
$10.95

25

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 3.1k
MMBtu
8.0%
- Electrical $14k 303k
kWh
10.9%
- Natural Gas $13k -
MMBtu
-
Waste -
Productivity/Other ($-0.1)k
TOTAL $41k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $310k 39k
MMBtu
$7.46
- Electrical $124k 2,783k
kWh
$0.045
- Natural Gas $133k 10k
MMBtu
$10.95

11

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $9.4k 1.0k
MMBtu
2.6%
- Electrical $4.3k 99k
kWh
3.5%
- Natural Gas $3.9k -
MMBtu
-
Waste -
Productivity/Other ($-0.1)k
TOTAL $9.3k
*May be negative reflecting an increased cost component required to save energy and costs overall