ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Specialty trade contractors
SIC 2+ Digits Required
3+ Characters Required for Products

9

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,080k 152k
MMBtu
$9.69
- Electrical $367k 7,015k
kWh
$0.083
- Natural Gas $156k 18k
MMBtu
$6.25

69

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $97k 4.4k
MMBtu
2.9%
- Electrical $28k 425k
kWh
6.1%
- Natural Gas $5.9k -
MMBtu
-
Waste -
Productivity/Other ($0.0)k
TOTAL $97k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,080k 152k
MMBtu
$9.69
- Electrical $367k 7,015k
kWh
$0.083
- Natural Gas $156k 18k
MMBtu
$6.25

35

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $66k 1.6k
MMBtu
1.0%
- Electrical $13k 153k
kWh
2.2%
- Natural Gas $1.6k -
MMBtu
-
Waste -
Productivity/Other ($0.0)k
TOTAL $66k