ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Oil and gas pipeline and related structures construction
SIC 2+ Digits Required
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $228k 23k
MMBtu
$9.70
- Electrical $56k 1,268k
kWh
$0.044
- Natural Gas $89k 10k
MMBtu
$8.46

9

Recommendations

9.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $52k 3.0k
MMBtu
12.6%
- Electrical $13k 288k
kWh
22.7%
- Natural Gas -
-
MMBtu
-
Waste $8.0k
Productivity/Other ($-0.5)k
TOTAL $60k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $228k 23k
MMBtu
$9.70
- Electrical $56k 1,268k
kWh
$0.044
- Natural Gas $89k 10k
MMBtu
$8.46

4

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $8.8k 0.6k
MMBtu
2.7%
- Electrical $2.7k 62k
kWh
4.9%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $8.8k
*May be negative reflecting an increased cost component required to save energy and costs overall