ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Water and sewer line and related structures construction
SIC 2+ Digits Required
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $464k 65k
MMBtu
$7.00
- Electrical $256k 5,810k
kWh
$0.040
- Natural Gas $31k 5.0k
MMBtu
$7.23

26

Recommendations

6.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $53k 7.6k
MMBtu
11.7%
- Electrical $34k 745k
kWh
12.8%
- Natural Gas $2.6k -
MMBtu
-
Waste -
Productivity/Other $20k
TOTAL $73k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $464k 65k
MMBtu
$7.00
- Electrical $256k 5,810k
kWh
$0.040
- Natural Gas $31k 5.0k
MMBtu
$7.23

11

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $15k 2.1k
MMBtu
3.2%
- Electrical $7.4k 204k
kWh
3.5%
- Natural Gas $1.3k -
MMBtu
-
Waste -
Productivity/Other $19k
TOTAL $35k
*May be negative reflecting an increased cost component required to save energy and costs overall