ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Commercial and institutional building construction
SIC 2+ Digits Required
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $430k 56k
MMBtu
$7.62
- Electrical $122k 3,497k
kWh
$0.035
- Natural Gas $161k 21k
MMBtu
$7.86

7

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 3.3k
MMBtu
5.9%
- Electrical $11k 322k
kWh
9.2%
- Natural Gas $11k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $32k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $430k 56k
MMBtu
$7.62
- Electrical $122k 3,497k
kWh
$0.035
- Natural Gas $161k 21k
MMBtu
$7.86

6

Implemented Recommendations

6.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 3.3k
MMBtu
5.9%
- Electrical $11k 322k
kWh
9.2%
- Natural Gas $11k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $29k
*May be negative reflecting an increased cost component required to save energy and costs overall