ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Industrial building construction
SIC 2+ Digits Required
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $588k 83k
MMBtu
$7.09
- Electrical $473k 7,067k
kWh
$0.067
- Natural Gas $114k 10k
MMBtu
$10.94

11

Recommendations

11.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $209k 27k
MMBtu
32.4%
- Electrical $175k 2,619k
kWh
37.1%
- Natural Gas $21k -
MMBtu
-
Waste $2.3k
Productivity/Other -
TOTAL $211k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $588k 83k
MMBtu
$7.09
- Electrical $473k 7,067k
kWh
$0.067
- Natural Gas $114k 10k
MMBtu
$10.94

4

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $63k 9.1k
MMBtu
11.0%
- Electrical $60k 888k
kWh
12.6%
- Natural Gas -
-
MMBtu
-
Waste $2.3k
Productivity/Other -
TOTAL $66k
*May be negative reflecting an increased cost component required to save energy and costs overall