ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Construction of buildings
SIC 2+ Digits Required
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $509k 70k
MMBtu
$7.36
- Electrical $298k 5,282k
kWh
$0.051
- Natural Gas $138k 15k
MMBtu
$9.40

18

Recommendations

9.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $121k 15k
MMBtu
21.7%
- Electrical $93k 1,471k
kWh
27.8%
- Natural Gas $16k -
MMBtu
-
Waste $1.1k
Productivity/Other -
TOTAL $122k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $509k 70k
MMBtu
$7.36
- Electrical $298k 5,282k
kWh
$0.051
- Natural Gas $138k 15k
MMBtu
$9.40

10

Implemented Recommendations

5.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $46k 6.2k
MMBtu
8.9%
- Electrical $35k 605k
kWh
11.5%
- Natural Gas $5.5k -
MMBtu
-
Waste $1.1k
Productivity/Other -
TOTAL $47k
*May be negative reflecting an increased cost component required to save energy and costs overall