ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Steam and air-conditioning supply
SIC 2+ Digits Required
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,820k 401k
MMBtu
$5.27
- Electrical $1,076k 17,970k
kWh
$0.058
- Natural Gas $919k 214k
MMBtu
$3.33

33

Recommendations

4.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $82k 9.7k
MMBtu
2.4%
- Electrical $62k 942k
kWh
5.2%
- Natural Gas $20k -
MMBtu
-
Waste $0.4k
Productivity/Other $4.0k
TOTAL $87k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,820k 401k
MMBtu
$5.27
- Electrical $1,076k 17,970k
kWh
$0.058
- Natural Gas $919k 214k
MMBtu
$3.33

16

Implemented Recommendations

2.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 4.0k
MMBtu
1.0%
- Electrical $26k 390k
kWh
2.2%
- Natural Gas $5.0k -
MMBtu
-
Waste -
Productivity/Other $3.5k
TOTAL $34k
*May be negative reflecting an increased cost component required to save energy and costs overall