ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Sewage treatment facilities
SIC 2+ Digits Required
3+ Characters Required for Products

288

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $889k 118k
MMBtu
$9.23
- Electrical $570k 9,109k
kWh
$0.073
- Natural Gas $90k 20k
MMBtu
$3.66

1,684

Recommendations

5.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $207k 20k
MMBtu
17.0%
- Electrical $134k 1,966k
kWh
21.6%
- Natural Gas $11k -
MMBtu
-
Waste $11k
Productivity/Other $66k
TOTAL $284k
*May be negative reflecting an increased cost component required to save energy and costs overall

266

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $933k 125k
MMBtu
$8.96
- Electrical $598k 9,624k
kWh
$0.072
- Natural Gas $95k 21k
MMBtu
$3.51

828

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $106k 11k
MMBtu
9.1%
- Electrical $73k 1,111k
kWh
11.5%
- Natural Gas $4.6k -
MMBtu
-
Waste $3.7k
Productivity/Other $17k
TOTAL $126k
*May be negative reflecting an increased cost component required to save energy and costs overall