ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Sewage treatment facilities
SIC 2+ Digits Required
3+ Characters Required for Products

278

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $908k 121k
MMBtu
$9.16
- Electrical $582k 9,328k
kWh
$0.073
- Natural Gas $92k 20k
MMBtu
$3.58

1,636

Recommendations

5.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $211k 21k
MMBtu
17.0%
- Electrical $137k 2,010k
kWh
21.5%
- Natural Gas $10k -
MMBtu
-
Waste $11k
Productivity/Other $67k
TOTAL $289k
*May be negative reflecting an increased cost component required to save energy and costs overall

252

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $937k 123k
MMBtu
$8.99
- Electrical $607k 9,845k
kWh
$0.072
- Natural Gas $93k 20k
MMBtu
$3.48

798

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $109k 12k
MMBtu
9.5%
- Electrical $75k 1,136k
kWh
11.5%
- Natural Gas $4.8k -
MMBtu
-
Waste $3.9k
Productivity/Other $17k
TOTAL $130k
*May be negative reflecting an increased cost component required to save energy and costs overall