ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Sewage treatment facilities
SIC 2+ Digits Required
3+ Characters Required for Products

275

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $913k 122k
MMBtu
$9.13
- Electrical $584k 9,376k
kWh
$0.073
- Natural Gas $93k 20k
MMBtu
$3.58

1,623

Recommendations

5.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $216k 21k
MMBtu
17.0%
- Electrical $137k 2,023k
kWh
21.6%
- Natural Gas $10k -
MMBtu
-
Waste $11k
Productivity/Other $68k
TOTAL $296k
*May be negative reflecting an increased cost component required to save energy and costs overall

245

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $923k 122k
MMBtu
$9.01
- Electrical $600k 9,772k
kWh
$0.072
- Natural Gas $91k 20k
MMBtu
$3.45

774

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $106k 12k
MMBtu
9.5%
- Electrical $74k 1,125k
kWh
11.5%
- Natural Gas $2.1k -
MMBtu
-
Waste $4.0k
Productivity/Other $18k
TOTAL $127k
*May be negative reflecting an increased cost component required to save energy and costs overall