ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Sewage treatment facilities
SIC 2+ Digits Required
3+ Characters Required for Products

289

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $886k 118k
MMBtu
$9.23
- Electrical $568k 9,084k
kWh
$0.073
- Natural Gas $90k 19k
MMBtu
$3.69

1,688

Recommendations

5.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $207k 20k
MMBtu
17.1%
- Electrical $134k 1,962k
kWh
21.6%
- Natural Gas $11k -
MMBtu
-
Waste $11k
Productivity/Other $66k
TOTAL $283k
*May be negative reflecting an increased cost component required to save energy and costs overall

274

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $921k 123k
MMBtu
$9.05
- Electrical $589k 9,452k
kWh
$0.072
- Natural Gas $94k 20k
MMBtu
$3.64

851

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $105k 11k
MMBtu
9.1%
- Electrical $72k 1,090k
kWh
11.5%
- Natural Gas $5.9k -
MMBtu
-
Waste $3.6k
Productivity/Other $17k
TOTAL $126k
*May be negative reflecting an increased cost component required to save energy and costs overall