ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Sewage treatment facilities
SIC 2+ Digits Required
3+ Characters Required for Products

281

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $905k 121k
MMBtu
$9.24
- Electrical $580k 9,279k
kWh
$0.073
- Natural Gas $92k 20k
MMBtu
$3.61

1,651

Recommendations

5.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $211k 20k
MMBtu
17.0%
- Electrical $136k 1,998k
kWh
21.5%
- Natural Gas $12k -
MMBtu
-
Waste $11k
Productivity/Other $68k
TOTAL $290k
*May be negative reflecting an increased cost component required to save energy and costs overall

261

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $922k 120k
MMBtu
$8.99
- Electrical $597k 9,642k
kWh
$0.072
- Natural Gas $91k 20k
MMBtu
$3.50

820

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $106k 11k
MMBtu
9.5%
- Electrical $73k 1,116k
kWh
11.6%
- Natural Gas $4.7k -
MMBtu
-
Waste $3.8k
Productivity/Other $17k
TOTAL $127k
*May be negative reflecting an increased cost component required to save energy and costs overall