ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Water supply and irrigation systems
SIC 2+ Digits Required
3+ Characters Required for Products

126

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $555k 76k
MMBtu
$9.71
- Electrical $398k 6,462k
kWh
$0.076
- Natural Gas $38k 9.0k
MMBtu
$3.51

657

Recommendations

5.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $96k 11k
MMBtu
14.8%
- Electrical $72k 1,092k
kWh
16.9%
- Natural Gas $7.5k -
MMBtu
-
Waste $14k
Productivity/Other $16k
TOTAL $126k
*May be negative reflecting an increased cost component required to save energy and costs overall

111

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $595k 81k
MMBtu
$9.53
- Electrical $425k 6,915k
kWh
$0.074
- Natural Gas $43k 10k
MMBtu
$3.28

276

Implemented Recommendations

2.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 5.8k
MMBtu
7.2%
- Electrical $39k 569k
kWh
8.2%
- Natural Gas $1.3k -
MMBtu
-
Waste $0.3k
Productivity/Other $0.1k
TOTAL $48k
*May be negative reflecting an increased cost component required to save energy and costs overall