ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 221310 Water supply and irrigation systems

118

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $580k 79k
MMBtu
$9.77
- Electrical $415k 6,753k
kWh
$0.076
- Natural Gas $40k 9.6k
MMBtu
$3.52

625

Recommendations

5.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $95k 11k
MMBtu
13.9%
- Electrical $69k 1,073k
kWh
15.9%
- Natural Gas $7.9k -
MMBtu
-
Waste $15k
Productivity/Other $17k
TOTAL $127k
*May be negative reflecting an increased cost component required to save energy and costs overall

105

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $599k 83k
MMBtu
$9.29
- Electrical $430k 7,091k
kWh
$0.071
- Natural Gas $38k 9.6k
MMBtu
$3.29

257

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 5.6k
MMBtu
6.8%
- Electrical $37k 549k
kWh
7.7%
- Natural Gas $1.4k -
MMBtu
-
Waste $0.3k
Productivity/Other $0.1k
TOTAL $46k
*May be negative reflecting an increased cost component required to save energy and costs overall