The ITAC Statistics page displays the average assessment results for the selected criteria.
116
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $585k | 80k |
MMBtu
|
$9.57 |
- Electrical | $418k | 6,830k |
kWh
|
$0.074 |
- Natural Gas | $41k | 9.8k |
MMBtu
|
$3.58 |
617
Recommendations
5.3
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $96k | 11k |
MMBtu
|
13.9% |
- Electrical | $70k | 1,086k |
kWh
|
15.9% |
- Natural Gas | $8.1k | - |
MMBtu
|
- |
Waste | $15k | |||
Productivity/Other | $17k | |||
TOTAL | $128k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
104
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $603k | 83k |
MMBtu
|
$9.28 |
- Electrical | $433k | 7,144k |
kWh
|
$0.071 |
- Natural Gas | $39k | 9.7k |
MMBtu
|
$3.32 |
252
Implemented Recommendations
2.4
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $41k | 4.9k |
MMBtu
|
5.9% |
- Electrical | $32k | 481k |
kWh
|
6.7% |
- Natural Gas | $1.4k | - |
MMBtu
|
- |
Waste | $0.3k | |||
Productivity/Other | ($0.0)k | |||
TOTAL | $41k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |