ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Water, sewage and other systems
SIC 2+ Digits Required
3+ Characters Required for Products

404

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $826k 114k
MMBtu
$9.28
- Electrical $540k 8,703k
kWh
$0.074
- Natural Gas $91k 20k
MMBtu
$3.59

2,298

Recommendations

5.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $174k 18k
MMBtu
15.5%
- Electrical $115k 1,713k
kWh
19.7%
- Natural Gas $9.8k -
MMBtu
-
Waste $12k
Productivity/Other $51k
TOTAL $238k
*May be negative reflecting an increased cost component required to save energy and costs overall

372

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $849k 115k
MMBtu
$8.98
- Electrical $559k 9,121k
kWh
$0.071
- Natural Gas $93k 21k
MMBtu
$3.40

1,094

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $89k 9.8k
MMBtu
8.5%
- Electrical $63k 957k
kWh
10.5%
- Natural Gas $3.8k -
MMBtu
-
Waste $2.8k
Productivity/Other $12k
TOTAL $103k