ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Water, sewage and other systems
SIC 2+ Digits Required
3+ Characters Required for Products

414

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $814k 112k
MMBtu
$9.32
- Electrical $533k 8,561k
kWh
$0.074
- Natural Gas $89k 20k
MMBtu
$3.57

2,344

Recommendations

5.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $173k 17k
MMBtu
15.6%
- Electrical $114k 1,699k
kWh
19.8%
- Natural Gas $11k -
MMBtu
-
Waste $12k
Productivity/Other $51k
TOTAL $236k
*May be negative reflecting an increased cost component required to save energy and costs overall

378

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $847k 115k
MMBtu
$9.01
- Electrical $558k 9,035k
kWh
$0.071
- Natural Gas $93k 21k
MMBtu
$3.42

1,100

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $88k 9.7k
MMBtu
8.4%
- Electrical $62k 943k
kWh
10.4%
- Natural Gas $3.7k -
MMBtu
-
Waste $2.7k
Productivity/Other $12k
TOTAL $102k
*May be negative reflecting an increased cost component required to save energy and costs overall