ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Water, sewage and other systems
SIC 2+ Digits Required
3+ Characters Required for Products

398

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $833k 115k
MMBtu
$9.19
- Electrical $545k 8,785k
kWh
$0.073
- Natural Gas $92k 21k
MMBtu
$3.57

2,273

Recommendations

5.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $179k 18k
MMBtu
15.5%
- Electrical $116k 1,731k
kWh
19.7%
- Natural Gas $9.9k -
MMBtu
-
Waste $12k
Productivity/Other $52k
TOTAL $243k
*May be negative reflecting an increased cost component required to save energy and costs overall

356

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $847k 116k
MMBtu
$9.01
- Electrical $560k 9,165k
kWh
$0.071
- Natural Gas $92k 21k
MMBtu
$3.41

1,042

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $85k 9.5k
MMBtu
8.2%
- Electrical $61k 923k
kWh
10.1%
- Natural Gas $1.9k -
MMBtu
-
Waste $2.9k
Productivity/Other $12k
TOTAL $100k
*May be negative reflecting an increased cost component required to save energy and costs overall