ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Water, sewage and other systems
SIC 2+ Digits Required
3+ Characters Required for Products

433

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $795k 108k
MMBtu
$9.34
- Electrical $521k 8,333k
kWh
$0.074
- Natural Gas $87k 19k
MMBtu
$3.71

2,440

Recommendations

5.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $170k 17k
MMBtu
15.8%
- Electrical $113k 1,666k
kWh
20.0%
- Natural Gas $11k -
MMBtu
-
Waste $12k
Productivity/Other $54k
TOTAL $237k
*May be negative reflecting an increased cost component required to save energy and costs overall

405

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $825k 113k
MMBtu
$9.15
- Electrical $539k 8,676k
kWh
$0.072
- Natural Gas $91k 20k
MMBtu
$3.54

1,156

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $85k 9.3k
MMBtu
8.2%
- Electrical $60k 907k
kWh
10.4%
- Natural Gas $4.4k -
MMBtu
-
Waste $2.5k
Productivity/Other $12k
TOTAL $100k
*May be negative reflecting an increased cost component required to save energy and costs overall