ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Electric power generation
SIC 2+ Digits Required
3+ Characters Required for Products

5

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $24,765k 7,722k
MMBtu
$5.14
- Electrical $2,998k 45,348k
kWh
$0.091
- Natural Gas $20,562k 6,754k
MMBtu
$3.50

26

Recommendations

5.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $461k 60k
MMBtu
0.8%
- Electrical $360k 5,892k
kWh
13.0%
- Natural Gas ($-47.0)k -
MMBtu
-
Waste -
Productivity/Other $66k
TOTAL $527k
*May be negative reflecting an increased cost component required to save energy and costs overall

4

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $29,727k 9,422k
MMBtu
$5.09
- Electrical $3,551k 55,718k
kWh
$0.064
- Natural Gas $24,669k 8,223k
MMBtu
$3.21

6

Implemented Recommendations

1.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 7.1k
MMBtu
0.1%
- Electrical $47k 694k
kWh
1.2%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $0.3k
TOTAL $47k
*May be negative reflecting an increased cost component required to save energy and costs overall