ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Utilities
SIC 2+ Digits Required
3+ Characters Required for Products

427

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,072k 197k
MMBtu
$9.28
- Electrical $553k 8,875k
kWh
$0.074
- Natural Gas $318k 96k
MMBtu
$3.73

2,405

Recommendations

5.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $176k 18k
MMBtu
9.0%
- Electrical $117k 1,735k
kWh
19.6%
- Natural Gas $9.8k -
MMBtu
-
Waste $12k
Productivity/Other $50k
TOTAL $237k
*May be negative reflecting an increased cost component required to save energy and costs overall

403

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,120k 207k
MMBtu
$9.11
- Electrical $574k 9,226k
kWh
$0.072
- Natural Gas $336k 102k
MMBtu
$3.53

1,161

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $86k 9.4k
MMBtu
4.6%
- Electrical $61k 920k
kWh
10.0%
- Natural Gas $4.5k -
MMBtu
-
Waste $2.5k
Productivity/Other $12k
TOTAL $101k
*May be negative reflecting an increased cost component required to save energy and costs overall