ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Utilities
SIC 2+ Digits Required
3+ Characters Required for Products

402

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,121k 207k
MMBtu
$9.15
- Electrical $574k 9,252k
kWh
$0.073
- Natural Gas $337k 102k
MMBtu
$3.57

2,295

Recommendations

5.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $182k 18k
MMBtu
8.8%
- Electrical $119k 1,783k
kWh
19.3%
- Natural Gas $9.3k -
MMBtu
-
Waste $12k
Productivity/Other $53k
TOTAL $247k
*May be negative reflecting an increased cost component required to save energy and costs overall

360

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,168k 219k
MMBtu
$8.97
- Electrical $593k 9,683k
kWh
$0.071
- Natural Gas $365k 112k
MMBtu
$3.41

1,048

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $85k 9.4k
MMBtu
4.3%
- Electrical $61k 920k
kWh
9.5%
- Natural Gas $1.9k -
MMBtu
-
Waste $2.8k
Productivity/Other $12k
TOTAL $100k
*May be negative reflecting an increased cost component required to save energy and costs overall