ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Utilities
SIC 2+ Digits Required
3+ Characters Required for Products

414

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,099k 202k
MMBtu
$9.28
- Electrical $565k 9,077k
kWh
$0.074
- Natural Gas $328k 99k
MMBtu
$3.57

2,346

Recommendations

5.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $178k 18k
MMBtu
8.9%
- Electrical $118k 1,754k
kWh
19.3%
- Natural Gas $10.0k -
MMBtu
-
Waste $12k
Productivity/Other $52k
TOTAL $241k
*May be negative reflecting an increased cost component required to save energy and costs overall

379

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,154k 213k
MMBtu
$8.96
- Electrical $591k 9,567k
kWh
$0.071
- Natural Gas $352k 107k
MMBtu
$3.43

1,106

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $88k 9.7k
MMBtu
4.6%
- Electrical $63k 948k
kWh
9.9%
- Natural Gas $3.7k -
MMBtu
-
Waste $2.7k
Productivity/Other $12k
TOTAL $102k
*May be negative reflecting an increased cost component required to save energy and costs overall