ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Utilities
SIC 2+ Digits Required
3+ Characters Required for Products

407

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,112k 205k
MMBtu
$9.23
- Electrical $571k 9,186k
kWh
$0.073
- Natural Gas $333k 101k
MMBtu
$3.56

2,316

Recommendations

5.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $178k 18k
MMBtu
8.8%
- Electrical $119k 1,768k
kWh
19.2%
- Natural Gas $9.2k -
MMBtu
-
Waste $12k
Productivity/Other $52k
TOTAL $242k
*May be negative reflecting an increased cost component required to save energy and costs overall

368

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,171k 218k
MMBtu
$8.96
- Electrical $597k 9,712k
kWh
$0.071
- Natural Gas $361k 110k
MMBtu
$3.42

1,077

Implemented Recommendations

2.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $88k 9.7k
MMBtu
4.5%
- Electrical $63k 949k
kWh
9.8%
- Natural Gas $3.8k -
MMBtu
-
Waste $2.8k
Productivity/Other $12k
TOTAL $103k
*May be negative reflecting an increased cost component required to save energy and costs overall