ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Support activities for oil and gas operations
SIC 2+ Digits Required
3+ Characters Required for Products

4

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $310k 162k
MMBtu
$7.43
- Electrical $135k 1,969k
kWh
$0.080
- Natural Gas $84k 141k
MMBtu
$2.81

25

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 1.3k
MMBtu
0.8%
- Electrical $9.4k 131k
kWh
6.7%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $12k
TOTAL $25k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $81k 8.9k
MMBtu
$9.38
- Electrical $63k 804k
kWh
$0.086
- Natural Gas $2.9k 0.3k
MMBtu
$3.56

9

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $1.5k 0.2k
MMBtu
2.0%
- Electrical $1.2k 17k
kWh
2.1%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $14k
TOTAL $16k
*May be negative reflecting an increased cost component required to save energy and costs overall