ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS All other nonmetallic mineral mining
SIC 2+ Digits Required
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,304k 376k
MMBtu
$8.62
- Electrical $741k 18,389k
kWh
$0.039
- Natural Gas $2,002k 188k
MMBtu
$5.02

19

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $234k 5.5k
MMBtu
1.5%
- Electrical $21k 533k
kWh
2.9%
- Natural Gas $199k -
MMBtu
-
Waste -
Productivity/Other $3.9k
TOTAL $238k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,304k 376k
MMBtu
$8.62
- Electrical $741k 18,389k
kWh
$0.039
- Natural Gas $2,002k 188k
MMBtu
$5.02

7

Implemented Recommendations

2.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $91k 3.3k
MMBtu
0.9%
- Electrical $12k 317k
kWh
1.7%
- Natural Gas $78k -
MMBtu
-
Waste -
Productivity/Other $1.2k
TOTAL $92k