ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other chemical and fertilizer mineral mining
SIC 2+ Digits Required
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $517k 38k
MMBtu
$11.48
- Electrical $223k 2,696k
kWh
$0.079
- Natural Gas $40k 6.2k
MMBtu
$3.21

12

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $25k 2.2k
MMBtu
5.8%
- Electrical $18k 218k
kWh
8.1%
- Natural Gas $1.0k -
MMBtu
-
Waste -
Productivity/Other $8.5k
TOTAL $34k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $517k 38k
MMBtu
$11.48
- Electrical $223k 2,696k
kWh
$0.079
- Natural Gas $40k 6.2k
MMBtu
$3.21

6

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $17k 2.1k
MMBtu
5.3%
- Electrical $17k 200k
kWh
7.4%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $8.5k
TOTAL $26k
*May be negative reflecting an increased cost component required to save energy and costs overall