ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Industrial sand mining
SIC 2+ Digits Required
3+ Characters Required for Products

6

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,096k 363k
MMBtu
$6.71
- Electrical $981k 18,541k
kWh
$0.055
- Natural Gas $707k 170k
MMBtu
$2.71

51

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $145k 11k
MMBtu
3.0%
- Electrical $59k 1,073k
kWh
5.8%
- Natural Gas $64k -
MMBtu
-
Waste -
Productivity/Other $26k
TOTAL $171k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,096k 363k
MMBtu
$6.71
- Electrical $981k 18,541k
kWh
$0.055
- Natural Gas $707k 170k
MMBtu
$2.71

17

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $28k 3.6k
MMBtu
1.0%
- Electrical $18k 354k
kWh
1.9%
- Natural Gas $6.6k -
MMBtu
-
Waste -
Productivity/Other $26k
TOTAL $54k
*May be negative reflecting an increased cost component required to save energy and costs overall