The ITAC Statistics page displays the average assessment results for the selected criteria.
15
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $2,211k | 501k |
MMBtu
|
$7.64 |
- Electrical | $822k | 23,624k |
kWh
|
$0.057 |
- Natural Gas | $963k | 246k |
MMBtu
|
$2.27 |
108
Recommendations
7.2
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $390k | 19k |
MMBtu
|
3.7% |
- Electrical | $54k | 1,809k |
kWh
|
7.7% |
- Natural Gas | $204k | - |
MMBtu
|
- |
Waste | $33k | |||
Productivity/Other | $96k | |||
TOTAL | $519k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
15
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $2,211k | 501k |
MMBtu
|
$7.64 |
- Electrical | $822k | 23,624k |
kWh
|
$0.057 |
- Natural Gas | $963k | 246k |
MMBtu
|
$2.27 |
39
Implemented Recommendations
2.6
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $105k | 6.0k |
MMBtu
|
1.2% |
- Electrical | $17k | 583k |
kWh
|
2.5% |
- Natural Gas | $72k | - |
MMBtu
|
- |
Waste | $8.8k | |||
Productivity/Other | $28k | |||
TOTAL | $143k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |