Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Crushed and broken granite mining and quarrying
SIC 2+ Digits Required
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $940k 121k
MMBtu
$21.60
- Electrical $428k 7,710k
kWh
$0.065
- Natural Gas $269k 42k
MMBtu
$3.20

14

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 5.4k
MMBtu
4.5%
- Electrical $30k 529k
kWh
6.9%
- Natural Gas $6.5k -
MMBtu
-
Waste -
Productivity/Other $198k
TOTAL $245k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,273k 226k
MMBtu
$5.63
- Electrical $735k 13,841k
kWh
$0.053
- Natural Gas $538k 84k
MMBtu
$6.40

6

Implemented Recommendations

6.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $49k 9.6k
MMBtu
4.2%
- Electrical $49k 932k
kWh
6.7%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other ($-3.0)k
TOTAL $46k
*May be negative reflecting an increased cost component required to save energy and costs overall